Installing electrical installations in buildings and pulling wires, where a network of evacuated plastic pipes is used to connect electrical work to each other, and based on the number of electrical wires that pass through this network, the diameter of the pipes is determined, and the plastic pipe network is implemented in several stages:
The first stage: extending the network to the structural structure of the building, starting from the floor hangers and ceilings before pouring them with concrete, and the network is completed once the walls are completed.
The second stage: After completing the construction of the walls, the extension of the evacuated plastic pipe network is completed through the Hungarian work of this network by cracking inside these walls, after that the boxes for the switches and switches, and sub-panels are installed inside the building in preparation for making a cement survey for the walls.
The third stage: After completing the extension of the network of plastic pipes, installing the main and sub-panels, and wiping the walls with cement, the boxes for the switches and plaques are cleaned in preparation for the stage of drawing the electrical wires.
The fourth stage: Once the wires are drawn, they are connected inside the main and sub-panels, and then connected to the panels, heaters, and air conditioning units.